Description:
Investor: Municipality Centar/KJKP “Vodovod i kanalizacija” d.o.o. Sarajevo
Engineer: KJKP “Vodovod i kanalizacija” d.o.o. Sarajevo
Contractor: Unioninvest d.d. Sarajevo
Project value: 246,347.87 KM including VAT
The project solution envisages that the water from the hydroflex “Slatinski put” is transported to the newly built collection basin of the hydroflex plant through the existing dactyl pipeline DN 100 mm, and then, using the hydroflex station, the water is pumped through pressure pipelines to consumers, who until now had no supply from the city’s water supply network . Above the collection basin, the construction of a brick building with a flat AB roof is planned, to accommodate the hydroflex plant with an expansion tank, as well as the necessary plumbing fixtures and fittings.
Operational readiness and safety of the system will be improved by abolishing the old local pumping station and building a new one with associated equipment.
The project was successfully completed. Management of the network, as well as the new PS, was taken over by KJKP ViK d.o.o. Sarajevo.