Project: Execution of works on water supply for the settlements of Poturovići and Ljubina in the municipality of Vogošća – Phase I (Construction of the pumping station and reservoir “Poturovići”).
Client: Municipality of Vogošća, KJKP “ViK” d.o.o., Sarajevo
Supervision: Sarajevo Canton Construction Institute
Contractor: Unioninvest d.d., Sarajevo
Designer: Institute for Water Management d.d., Sarajevo
Project Value: 919,177.01 BAM (468.500 €)
Project Description: As part of the activities to address the water supply issues in the settlements of Poturovići and Ljubina in the municipality of Vogošća, the construction of facilities – a pumping station, access road to the reservoir, and reservoir – is planned as the first phase. The purpose of the pumping station is to transport a water quantity of 1.62 l/s (from the water chamber V = 11.25 m3) via the designated pressure pipeline DN 50 mm, with a length of approximately 576.0 m to the Poturovići reservoir (Kdn/Kpr = 622.0/625.0 m.a.s.l.).