Supply and installation of central ventilation and air conditioning system – Pathology, including all related mechanical, electrical and civil works in the areas of Clinical Pathology at the third floor and the roof of the Clinical Center building.
Installation includes all the associated installations and equipment, as well as commissioning and proving designed parameters.
Air chamber: Q = 95 kW
Condensation unit Qc= 44kW, Gh = 42 kW, medium freon
Basic information:
Total contract value: 139.906,42 BAM (71.533,00 €)
Investor: Clinical Center University of Sarajevo, KCUS
Location / Address: Ul. Bolnička br.25, Sarajevo
Period: April 2015-ongoing project