At the specified location investor plans to build office-production and storage facilities. The construction would be implemented in phases as following;
In the first phase, in the southern part of the parcel, construction of office and warehouse facility with two parallely located halls, measuring 40.60 m X 12.70 m, and between the sheltered manipulative plateau with dimensions of 30.00mX9.40 m, is planned. In the wester hall a boiler room with height h = 470cm is located, walled with bricks and finally plastered. At the bottom of the plateau, towards the river Zujevina a storage building with changing rooms and toilets, staff kitchenette and two offices is planned.
All vehicular access and pedestrian facilities are provided through manipulative plateau, and this is an internal traffic along the western border of the area, linked to industrial roads in the north..
Around the area a wire fencing with entrance gate to connection with industrial road is designed.