Mitrovica and Vushtrri water network Kosovo

Replacing the main water distribution lines and reconstruction of house connections. In the town of Mitrovica was made replacement of the main lines in five blocks with a total length of 3,500 m Ductile Pipes DN 100,150,200, as well as the 550m HDPE 100 pipe ɸ63 and conducted 430 household connections.
In the city Vushtrri was made replacement of the main lines in ten blocks with a total length of 3,800 m Ductile pipes DN 100 and 150 as well as HDPE 100 pipe ɸ63 – 90, and conducted 850 household connections.

Total Value: 1,647,000.00 BAM (€ 842,097.73)
Investor: IC Consultant / ILF
period 2001-2002

Ongoing projects

PS Krivoglavci 1 i 2

Investor/Contractor: Municipality of Vogošća, KJKP “ViK” d.o.o. SarajevoEngineer: KS Construction InstituteProject value: 717,700.00 BAMPS Krivoglavci 1As part of the activities to solve the problem of

More info »

Waste water treatment plant Prozor-Rama

Key project data: Identification number: 20060272-s040. Subject: Design and construction of wastewater treatment plant Prozor Rama (PE 3,000+3,000). Employer: Municipality of Prozor Rama, Bosnia and Herzegovina. Contract duration: 2 years. Signing of the contract, date: 16.07.2019. Contract Price: 3,547,725.99 KM (1,813,923.50 €)

More info »
Shopping Basket