Office building UNIONINVEST- Grbavička street

Office building is designed as a modern, high-class office building, which can provide its tenants a high level of comfort. 
The building was totally reconstructed , all floor coverings were replaced, covering of walls and ceilings also , all installations with rough and fine assembly, all facade and interior joinery and sheet-metal works,  all kitchen and sanitary equipment.
The building is connected to all city’s infrastructure.
The building is B+GF+6F
Total area:     P = 4.991,80 m2. 

Ongoing projects

Waste water treatment plant Prozor-Rama

Key project data: Identification number: 20060272-s040. Subject: Design and construction of wastewater treatment plant Prozor Rama (PE 3,000+3,000). Employer: Municipality of Prozor Rama, Bosnia and Herzegovina. Contract duration: 2 years. Signing of the contract, date: 16.07.2019. Contract Price: 3,547,725.99 KM (1,813,923.50 €)

More info »

Waste water treatment plant Bosanski Petrovac

Key project data: Identification number: 01/1-1-25-7482-UP-1/17
Subject: Design and construction of a wastewater treatment plant in Bosanski Petrovac (PE 5,000). Employer: Municipality of Bosanski Petrovac, Bosnia and Herzegovina. Contract duration: 2 years. Signing of the contract, date: 30.10.2018. Contract Price: 2,929,057.32 KM (1,497,603.23 €)

More info »

Villas SMUK Bjelašnica

Location: Trnovo municipality, Babin Dol, Olympic mountain Bjelašnica (300m from the ski lifts), Sarajevo, Federation of BiH, Bosnia and Herzegovina. Project description: The project includes 6 (six) villas with apartments, which together form one complex.

More info »