OHR building

Office building BMIGR is designed as a modern office building of high rank, which in accordance with the Regulatory Plan can provide their clients with high level services.
Total area:     P = 4.144,95 m2.  

The building is classified as a high standardized object (Class A) according to the following characteristics:

  • completely reconstructed building in accordance with first-class design
  • excellent location, central business area, good visibility and positioning
  • easy and quick access to the building
  • attractiveness to creditworthy and prestigious clientele
  • high level of rent
  • professional asset maintenance and management 
  • modern design and architecture
  • security concrete wall 2,5 m high
  • security/entry house in front of the building
  • installed first-class materials
  • modern high standard windows and window panes
  • reception in the lobby
  • incorporated raised floors, for deposit of cable route
  • Built-in two elevators 
  • power supply solved minimum with power from two sources, with automatic switch
  • HVAC system
  • telephone connection 
  • satisfied safety standards (installed fire alarm system)
  • video surveillance (CCTV), TV and IT system: installed in accordance with the requirements of the current user of the building

Ongoing projects

Waste water treatment plant Prozor-Rama

Key project data: Identification number: 20060272-s040. Subject: Design and construction of wastewater treatment plant Prozor Rama (PE 3,000+3,000). Employer: Municipality of Prozor Rama, Bosnia and Herzegovina. Contract duration: 2 years. Signing of the contract, date: 16.07.2019. Contract Price: 3,547,725.99 KM (1,813,923.50 €)

More info »

Waste water treatment plant Bosanski Petrovac

Key project data: Identification number: 01/1-1-25-7482-UP-1/17
Subject: Design and construction of a wastewater treatment plant in Bosanski Petrovac (PE 5,000). Employer: Municipality of Bosanski Petrovac, Bosnia and Herzegovina. Contract duration: 2 years. Signing of the contract, date: 30.10.2018. Contract Price: 2,929,057.32 KM (1,497,603.23 €)

More info »

Villas SMUK Bjelašnica

Location: Trnovo municipality, Babin Dol, Olympic mountain Bjelašnica (300m from the ski lifts), Sarajevo, Federation of BiH, Bosnia and Herzegovina. Project description: The project includes 6 (six) villas with apartments, which together form one complex.

More info »
Shopping Basket