Riverina shopping mall

Completion of building and craft works at building Riverina Shopping Center

Within the project were performed works on the completion of the Shopping Center.
The building was constructed by another company, but not completed, and during the three-year delay, the building was damaged due to unfavorable weather conditions.
Completion of the work which performed Unioninvest, included the following:
Concrete, reinforced concrete and masonry works
Steel Structures
Plumbing and carpentry work
Aluminum doors and windows, black doors and windows and fire doors
Reconstruction of flat roofs
Ceramics and stone-carvers work
Treatment of suspended ceilings, partition walls and floors on basement
Plastering and painting works in the entire property


Basic information:

Contract value: 948.572 BAM (€ 485.000)
Employer: MBI Development d.o.o. Sarajevo
Location / Address: Ilidža, Sarajevo
Period: July 2012 – September 2012