Investor/Contractor: Municipality of Vogošća, KJKP "ViK" d.o.o. Sarajevo
Engineer: KS Construction Institute
Project value: 717,700.00 BAM
PS Krivoglavci 1
As part of the activities to solve the problem of water supply in the settlements of Svrake and Krivoglavci I, the construction of the Krivoglavci I pumping station is planned. The pumping system consists of 3 pumping units, of which 2 are working and 1 is spare.
In the first phase, for the period until 2030, the inflow of water to PS is all day (24 h), in the amount of 9.45 l/s, and pumping towards the Krivoglavci 1 reservoir is 22 h per day, in the amount of 10.31 l/s, H= 69.27 mVS, 100%; 84%.
In the final phase (end of the planning period, 2050), the pumping system has the characteristics Q= 13.29 l/s, H= 71.71 mVS, 100%; 98%.
PS Krivoglavci 2
As part of the activities to solve the problem of water supply in the Krivoglavci II settlement, the construction of the Krivoglavci II pumping station is planned. The pumping system consists of 2 pumping aggregates, of which 1 is working and 1 is spare.
In the first phase, for the period until 2030, the inflow of water to PS is all day (24 h), in the amount of 4.11 l/s, and pumping towards the Krivoglavci 2 reservoir is 22 h per day, in the amount of 6.17 l/s, H= 70.61 mVS, 91%.
In the final phase (end of the planning period, 2050), the pumping system has characteristics Q= 7.38 l/s, H= 72.84 mVS, 99%.
PS Krivoglavci 1 i 2
Investor/Contractor: Municipality of Vogošća, KJKP “ViK” d.o.o. SarajevoEngineer: KS Construction InstituteProject value: 717,700.00 BAMPS Krivoglavci 1As part of the activities to solve the problem of