Revision of Main Design of Expansion of Terminal B, International Airport Sarajevo
In accordance with the Regulation on the Construction Site arrangement, required documentation, and on-site participants (Official Gazette of FBiH 48/09 of 27.07.2012.), Revision of Main Design of Expansion of Terminal B, Sarajevo International Airport was made and includes the following design phases:
- Architecture and Landscaping
- Construction part
- Sprinkler installation
- Technology of airport transport system
- Hydroinstallations
- Mechanical installations
- Electrical installations, weak and strong current
Expansion of the passenger terminal B includes:
- Construction and expansion of the terminal 1st phase (approximately 10.800 m2 brutto)
- Modification of existing terminal (approximately 9.000 m2 brutto)
- Construction of corresponding Landscaping (approximately 10.000 m2 brutto)
- Construction of all utilities for the Project
Basic information:
Total Value: 29.250,00 BAM (€ 14.955)
Investor: Sarajevo International Airport
Period: January 2012 – November 2012


