Revision of Main Design of Expansion of Terminal B, International Airport Sarajevo

In accordance with the Regulation on the Construction Site arrangement, required documentation, and on-site participants (Official Gazette of FBiH 48/09 of 27.07.2012.), Revision of Main Design of  Expansion of Terminal B,  Sarajevo International Airport was made and includes the following design phases:

  • Architecture and Landscaping
  • Construction part
  • Sprinkler installation
  • Technology of airport transport system
  • Hydroinstallations
  • Mechanical installations 
  • Electrical installations, weak and strong current

Expansion of the passenger terminal B includes:

  • Construction and expansion of the terminal 1st phase (approximately 10.800 m2 brutto)
  • Modification of existing terminal (approximately 9.000 m2 brutto)
  • Construction of corresponding Landscaping (approximately 10.000 m2 brutto)
  • Construction of all utilities for the Project

Basic information:

Total Value: 29.250,00 BAM (€ 14.955)
Investor:  Sarajevo International Airport 
Period: January 2012 – November 2012