Execution of electrical and mechanical installations, water supply and sewage installations during the construction of the business building of the headquarters of the company GP BOSNA
Basic information:
Contract value: 1,014,562 BAM (€518,738) Investor: GP BOSNA dd Sarajevo Location/Address: Zagebačka Street, Sarajevo Period: July 2007 – June 2008
Reconstruction of existing building and construction of the facility in order to reuse it in a modern business building with exterior decoration.
Basic information
Value of the contract: 1,308.000 EUR (€ 668,770) Investor: Exclusive doo Sarajevo Location / Address: Kolodvorska Street , Sarajevo Period: March 2008 – January 2009
Contract value: 31,000.000 BAM (15,850.050 €) Investor: Government of Republic of Greece and Council of Ministers of Bosnia and Herzegovina Location/Address:Sarajevo Period: 2006 – 2008
Unioninvest agreed to completely rebuild the existing building, on the basis of the proposed project, in October 2015, which includes construction, architectural, craft and installation works, within a period of 18 months. In all these phases of work, the latest technologies were applied and the most modern materials were used. The appearance of the glass itself on so-called double facade on the total area of about 15,000 square meters is set in Bosnia and Herzegovina for the first time and gives this building a representative appearance. All the installations are on this level. The air conditioning and the ventilation system installed in “ventilation ceiling,” deserve the special attention as this is the solution that is applied for the first time for the buildings in the southeastern Balkans. Support for this system consists of 28 air condition chambers (each floor has an independent air conditioning), a safe system of power supply, water – hot and cold. Its fronting is controlled by sensors. The building has 19,500 square meters of space, of which the office space has 15,000 square meters. About 1,000 employees will work in the comfortable offices and comfortable surroundings. Through this 19-storey building and the underground spaces, six passenger elevators and three cargo high-speed elevators move. Modern equipment installations and equipment were brought in about a hundred trucks and delivered by 50 Unioninvest subcontractors from the country and the world.
Two new facilities were built on their own site in Binježevo, making an industrial park like similar parks in Europe. That was the chance that LORA used first. The building built for its purpose was planned as the first phase of commercial center. Production-storage hall has an area of 3,000 square meters and it is fully equipped for the planned economic activity. Outdoor space includes 3,500 square meters. In the same location, the Swiss-Austrian company WÜRTH opened a logistics center
Thermal Riviera Ilidža is the largest tourist facility of its kind in Bosnia and Herzegovina. It is located on 15 hectares of land with attractive additional facilities to a total of 5.631 m2 thermal water areas as well as all the necessary technical equipment and infrastructure.
In addition to the water park construction of a hotel complex and conference and wellness center is planned in the future. Indoor swimming pool is irregulary shaped with a water surface of 1,000 m2 and a variety of water effects, such as water courses, tree adventure, whirlpools, children’s pool, massage beds, massage jets, water slide;
Outdoor pool with waves on the surface of 2.850 m2 is the biggest pool of its kind in this part of Europe.
Outdoor pool with water slide is irregular shaped and covers an area of 1.781 m2 of thermal water surface.
Unioninvest, as the leading partner of a consortium of companies, was responsible for completion of all works at the thermal Riviera, and directly completed all the hydro mechanical and electrical works, with infrastructure for water and sewerage. The external network is made of PVC and PE pipes DN 63 to DN 300 mm, the total length L = 9.800m.
Reconstruction of the government building Pristina, Kosovo
Basic data:
Contract value: 19,000.000 BAM (9,714.546 €) Investor: The European Agency forreconstruction and Ministry of Public Works of Kosovo Government Location/Address: Prishtina, Kosovo Period: 2004 – 2005
Complete reconstrution of the existing building includes civil, civil crafts works, as well as electrical, mechanical and water and sewerage installations.
Shopping Basket
Manage cookie consents
To provide the best experience, we use technologies such as cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this website. Non-consent or withdrawal of consent may adversely affect certain features and functions.
Functionality
Always active
Technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a particular service expressly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of communication over an electronic communication network.
Preferences
Technical storage or access is necessary for the legitimate purpose of storing preferences not requested by the subscriber or user.
Statistics
Technical storage or access used exclusively for statistical purposes.Technical storage or access used exclusively for anonymous statistical purposes. Without a subpoena, voluntary consent from your Internet service provider, or additional third-party records, information stored or retrieved solely for this purpose typically cannot be used to identify you.
Marketing
Technical storage or access is required to create user profiles to send advertisements or to track users on a website or across several websites for similar marketing purposes.