Unioninvest Inc. has signed a framework agreement for a period of two years, about Controling, Repairing and maintenance of street lighting in the municipality Trnovo in Sarajevo Canton.
Basic information:
The value of the framework agreement: 151,767 BAM (€ 77,600) Investor: Sarajevo Canton, Ministry of Physical Planning and Environment protection Location / Address: Municipality Trnovo, Canton Sarajevo Period: 2011 – 2014
Construction works, mechanical and electrical installations, for the Utility for compressing a natural gas.
Compressed natural gas is stored at a high pressure, usually 200-250 bars. CNG demands very robust specially-designed cylindrical tanks, which use a lot of space and are heavy. In addition, gas compression requires expensive multi-stage high-pressure compression technology.
The station is built according to the regulations as well put into operation on scheduled time.
Basic information:
Contract value: 242.200 BAM (€ 123.835) Investor: Energtek Herz d.o.o. Široki Brijeg Location / Address: Sarajevo Period: September 2012 – November 2012
Completion of building and craft works at building Riverina Shopping Center
Within the project were performed works on the completion of the Shopping Center. The building was constructed by another company, but not completed, and during the three-year delay, the building was damaged due to unfavorable weather conditions. Completion of the work which performed Unioninvest, included the following: Concrete, reinforced concrete and masonry works Steel Structures Plumbing and carpentry work Aluminum doors and windows, black doors and windows and fire doors Reconstruction of flat roofs Ceramics and stone-carvers work Treatment of suspended ceilings, partition walls and floors on basement Plastering and painting works in the entire property
Basic information:
Contract value: 948.572 BAM (€ 485.000) Employer: MBI Development d.o.o. Sarajevo Location / Address: Ilidža, Sarajevo Period: July 2012 – September 2012
Within two projects were carried out installation of garage ventilation and gas installations in residential and commercial buildings “STUP” and “Alipasino polje”.
Basic information:
Value of the contract: 212.146,00 BAM (€ 108.468,50) Investor: Penny Plus d.o.o. Sarajevo Location / Address: Sarajevo Period: May 2012 – July 2012
Construction, reconstruction and rehabilitation of street lighting in the municipality Vogošća, Sarajevo
Basic information:
Contract value: 91.290 BAM (€ 46.677) Employer: Department of Construction of Canton Sarajevo Location / Address: Municipality Vogosca, Sarajevo Period: July 2011 – September 2011
Performing mechanical installations, water and sewage installations and electrical installations (high and low current) during the construction of residential and office space in the center of Sarajevo Kosevo Street.
Basic information:
Value of the contract: 589.248,56 BAM (€ 301.278) Investor: GP BOSNA dd Sarajevo Location / Address: Kosevo street, Sarajevo Period: June 2011 – July 2011
Within the project were dismantled two of the four existing boilers.
The other two existing boilers which operate with extra light oil EL (type Viessmann 2.500 Mcal / h and Viessmann 3.000mcal / h) were repaired and put into proper condition , also repaired and reconstructed all mechanical installations, including the reconstruction of the ventilation system .
Two new boilers (low pressure steam boiler p = 0.5 bar , with Q = 5 t / h , the power of 3.300 kW ) combined with new burners for operation with natural gas / extra light oil were built.
As an additional security measure, in the boiler room has been installed a new system for gas detection in Ex version, as well as the connecting the new fire alarm system with the existing one.
Basic information:
Value of the contract : 862.578,11 BAM ( € 441.030 ) Client: Ministry of Finance and Treasury B&H Location / Address : Sarajevo Period : March 2011 – October 2011
Performing mechanical installations, water and sewage installations during the construction of residential and office building in the the street V.Lukića, Benis, Stup.
Basic information:
Contract value: 359.848 BAM (€ 183.987) Investor: GP BOSNA dd Sarajevo Location / Address: Street V.Lukića, Benis, Stup, Sarajevo Period: December 2010 – August 2011
To provide the best experience, we use technologies such as cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this website. Non-consent or withdrawal of consent may adversely affect certain features and functions.
Functionality
Always active
Technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a particular service expressly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of communication over an electronic communication network.
Preferences
Technical storage or access is necessary for the legitimate purpose of storing preferences not requested by the subscriber or user.
Statistics
Technical storage or access used exclusively for statistical purposes.Technical storage or access used exclusively for anonymous statistical purposes. Without a subpoena, voluntary consent from your Internet service provider, or additional third-party records, information stored or retrieved solely for this purpose typically cannot be used to identify you.
Marketing
Technical storage or access is required to create user profiles to send advertisements or to track users on a website or across several websites for similar marketing purposes.