Reconstruction of filter station Zdena, Sanski Most

Investor: EUROPEAN UNION, Delegation of the EuropeanCommission to BiH
The value of these works 2,364,478.00 EURO 

Works are done on the reconstruction filter as the capacity of 250 l / s: 

  • The layer opened filter box 4 +2: dimensions L = 5.0 m, b = 2×2, 5 m, H = 4.0 m 
  • Service station:
    • Clean water:    Q = 2×522 m3 / h,   H = 65m, N = 132.0 kW 
    • Raw-water:      Q = 2×540 m3 / h,   H =   5m, N =   15.0 kW 
    • Washing filter: Q = 2×486 m3 / h,    H =   8m, N =  18.5 kW 
    • Air blower –    Q = 28N m3/min 
  • Pools for coagulation: 4 pool size: 4.0 x 4.0 x 3.6 m 
  • Reservoir for raw water V = 35 m3 
  • Reservoir for clean water  V = 2×310 m3 
  • Station for dosing chemicals
  • Laboratory 
  • Pool for sedimentation

Sanski Most statement

Ongoing projects

Waste water treatment plant Prozor-Rama

Key project data: Identification number: 20060272-s040. Subject: Design and construction of wastewater treatment plant Prozor Rama (PE 3,000+3,000). Employer: Municipality of Prozor Rama, Bosnia and Herzegovina. Contract duration: 2 years. Signing of the contract, date: 16.07.2019. Contract Price: 3,547,725.99 KM (1,813,923.50 €)

More info »

Waste water treatment plant Bosanski Petrovac

Key project data: Identification number: 01/1-1-25-7482-UP-1/17
Subject: Design and construction of a wastewater treatment plant in Bosanski Petrovac (PE 5,000). Employer: Municipality of Bosanski Petrovac, Bosnia and Herzegovina. Contract duration: 2 years. Signing of the contract, date: 30.10.2018. Contract Price: 2,929,057.32 KM (1,497,603.23 €)

More info »

Villas SMUK Bjelašnica

Location: Trnovo municipality, Babin Dol, Olympic mountain Bjelašnica (300m from the ski lifts), Sarajevo, Federation of BiH, Bosnia and Herzegovina. Project description: The project includes 6 (six) villas with apartments, which together form one complex.

More info »
Shopping Basket