Reconstruction of the Waste Water Treatment plant for Trnovo town and the Building of Sewage Collector for Turovi Settlement, B&H

Identification No:  N0:BA-TR-ICB-W-01-TF055265 

Investor: KJKP „Vodovod i kanalizacija“ d.o.o. Sarajevo
The value of these works: 1,165,147.49 EURO
Plant size 5.000 IE; 10.000 IE in the final phase
Waste Water Treatment included:

Pumping station for primary waste water lifting with  two screw pumps capacity 80 l/s; automatic curve grid with adjustable time relay switching-off or manual switch-off; sand settlement track; canal with flow meter; bio-aeration basin with mammoth rotors – brushes regulation overflow; secondary settlement tank.

Waste water comes through the sewer of 400 mm to pumping station for primary lifting, where screw pumps are installed. Screw pumps lift the waste water at a certain height allowing gravitational flow of water through the plant. The treatment process begins with the grid. The automatic curve grid has been envisaged. The waste from the grid is collected in a container and transported to an appropriate disposal location. After the treatment at the grid, where waste particles larger than 16 mm are retained, waste water is transported to the sand settlement track.

Ongoing projects

PS Krivoglavci 1 i 2

Investor/Contractor: Municipality of Vogošća, KJKP “ViK” d.o.o. SarajevoEngineer: KS Construction InstituteProject value: 717,700.00 BAMPS Krivoglavci 1As part of the activities to solve the problem of

More info »
Shopping Basket