I-faza-izvodjenja-radova-na-rekonstrukciji-toplotnih-podstanica-2

Reconstrution works on heat substations, general hospital

«Prim.dr. Abdulah Nakaš», Sarajevo

Public Institution General Hospital «Prim.dr. Abdulah Nakaš», Sarajevo, dating from the 19th century, with specialized-consultative service within the more than 20 primary and oriented medical disciplines, provides its customers high standards of quality and safety, and the possibility of hospitalization as well as planned surgeries.

Within complete reconstruction of the steam heat substations in the General Hospital “Prim. Dr. Abdulah Nakas” Sarajevo, all elements of the old substation have been dismantled and have been built compact steam “Danfoss” substations made of modules, which after the connection, constitute a single entity.

Five reconstructed steam substations have capacity to fully meet the needs for heating, hot water consumables and thermal disinfection of water:

P 23 – O Icapacity1.100 kW
P 23 – O IIcapacity550 kW
P 25 – O Icapacity1.500 kW
P 301 – O Icapacity500 kW
P1203 – O Icapacity1.200 kW

Working of the embedded substation is fully remote monitored and enables monitoring and management from a single location.

The connection of quality components, rational composed , correctly embedded and connected in a compact system provided conditions that are necessary for operation of these types of facilities.

Basic information:

Total contract value: 776.617,94 BAM (397.078,45 €)
Investor: Public Institution General Hospital «Prim.dr. Abdulah Nakaš», Sarajevo
Location / Address: Sarajevo,B&H
Period: February 2014 – November 2014

BH-Telecom-sjediste-Centralna-zgrada-1

BH Telecom head quarters (Main building)

Performing the remaining construction and craft works and installation works for the completion of the BH Telecom building in Sarajevo with supply and installation of materials and equipment, till bringing the facility into full operation.

BH Telecom is a leading telecommunications company in Bosnia and Herzegovina, which for the purpose of saving costs in the work process and improving the quality of business, placed the key business sectors “under a common roof”, the office building of BH Telecom in the center of Sarajevo, at Franca Lehara No.7.

In public bid competition Unioninvest was chosen as the most favorable competitor and signed an agreement for performance of the remaining construction and craft works and installation works for the completion of the BH Telecom building in Sarajevo with supply and installation of materials and equipment, in order to put the facility into full operation. 
Until that time, only the main civil works have been completed.

Area of the building is 8.027m2 and has an open parking space of 1.887 m2 and garage with total area of 2.016m2.
Entrance in the building is a modern decorated entrance hall, and has 4 elevators and two staircases.

The building is designed for administrative purposes, modern, fully equipped and furnished, further enriched by works of art and works of famous and recognized the Bosnia and Herzegovina painters and artists.

In addition to administrative space, the building also has other facilities, a restaurant with a kitchen, coffee kitchens on each floor, the modern archive and storage space, as well as the technological area with the latest technology.

In addition to the designed mechanical, electrical and sewerage installations, we installed the most modern systems of low power: video surveillance system, access control system and registration of working time, and especially to highlight the LAN service (VOIP and IPTV) networks, as well as the multimedia hall and press center with audio and video systems.

Basic information:

Total contract value: 6,746.852.86 BAM (3,449.611,00 €)
Investor: BH Telecom dd Sarajevo
Area: approximately 8.027 m2
Location / Address: Street Franca Lehara, Sarajevo
Period: June 2013 – Oktober 2014

Sjediste-Sluzbe-za-poslove-sa-strancima-BiH-Sarajevo-LOT-2-vanjsko-uredjenje-8

Headquarters of Service for foreigners’ affairs of Bosnia and Herzegovina, Sarajevo – LOT 2 (external landscape)

Performing Works on exterior landscape of office building, headquarters of Service for Foreigners’ Affairs and Field Center in Sarajevo.

Basic information:

The total value of the contract: 422.572.31 EUR (€ 216,058.00)
Investor: Bosnia and Herzegovina, Ministry of Security B&H, Service for Foreigners’ Affairs
Area: 2,588.00 m2
Location / Address: Municipality Novi Grad, Sarajevo
Period: June 2013 – July 2015

Sterilna-jedinica-klinickog-centra-Univerziteta-u-Sarajevu-3

Sterile unit on clinical center of University of Sarajevo

Performing construction, construction-craft works, installation works and furnishing the interior of sterile unit within the Pediatrics Clinic.

By forming a sterile unit in which will be perform the transplantation of peripheral blood stem cells among the pediatric population, it is opened the course for the immediate commencement of autologous transplantation (transplantation of own healthy stem cells), and at the same time have been created conditions for the formation of a stem cell bank and perform allogeneic transplantation of peripheral stem cells (the other donors) .

Equipping and adapting the existing premises for this purpose is crucial, both for Sarajevo, and for Bosnia and Herzegovina, considering that today in Bosnia and Herzegovina there is no other center for this type of medical treatment for children.

KCUS plans to build facilities for autologous stem cell transplantation on the floor 08 of the Clinic for Gynecology, Obstetrics and Pediatrics, Jezero in Sarajevo.

Spatial, architectural and installations interventions, which Unioninvest performed, includes 1 double room in a sterile unit, reducing 1 quadruple room in order to triple room and the accompanying space, and conversion of the existing toilets in functionality changed departments. The total area covers a 67,48m2.

New sterile isolation room is planned as a single patient room with toilet. In order to prevent the penetration of air from the contact room to sterile room, it is in a constant overpressure in relation to all the areas with which it is associated. Filter spaces are under pressure in relation to the sterile room, and in an overpressure in relation to other areas which are not included in the division of sterile unit. Sterile room, as a special unit in the department, works exclusively according to the specifications of equipment manufacturers. All the walls and ceiling in a sterile unit are antibacterial panels. The front door of the room and toilet are also antibacterial. Equipment and appliances for the whole area of sterile rooms and toilets are exclusively ordered according to the instructions of the designer  and equipment supplier.

Basic information:

The total value of the contract: 388,155.53 BAM (€ 198,460.80)
Investor: Clinical Center University of Sarajevo, KCUS
Location / Address: Jezero, KCUS, Sarajevo
Period: October 2013 – April 2014

Odrzavanje-javne-rasvjete-opcina-Trnovo-2

Public lighting maintenance, municipality Trnovo

Unioninvest Inc. has signed a framework agreement for a period of two years, about Controling, Repairing and maintenance of street lighting in the municipality Trnovo in Sarajevo Canton.

Basic information:

The value of the framework agreement: 151,767 BAM (€ 77,600)
Investor: Sarajevo Canton, Ministry of Physical Planning and Environment protection
Location / Address: Municipality Trnovo, Canton Sarajevo
Period: 2011 – 2014

OLYMPUS DIGITAL CAMERA

Filling station for compressed natural gas (CNG)

Construction works, mechanical and electrical installations, for the Utility for compressing a natural gas.

Compressed natural gas is stored at a high pressure, usually 200-250 bars. CNG demands very robust specially-designed cylindrical tanks, which use a lot of space and are heavy. In addition, gas compression requires expensive multi-stage high-pressure compression technology.

The station is built according to the regulations as well put into operation on scheduled time.

Basic information:

Contract value: 242.200 BAM (€ 123.835)
Investor: Energtek Herz d.o.o. Široki Brijeg
Location / Address: Sarajevo
Period: September 2012 – November 2012

Riverina-soping-centar-3

Riverina shopping mall

Completion of building and craft works at building Riverina Shopping Center

Within the project were performed works on the completion of the Shopping Center.
The building was constructed by another company, but not completed, and during the three-year delay, the building was damaged due to unfavorable weather conditions.
Completion of the work which performed Unioninvest, included the following:
Concrete, reinforced concrete and masonry works
Steel Structures
Plumbing and carpentry work
Aluminum doors and windows, black doors and windows and fire doors
Reconstruction of flat roofs
Ceramics and stone-carvers work
Treatment of suspended ceilings, partition walls and floors on basement
Plastering and painting works in the entire property


Basic information:

Contract value: 948.572 BAM (€ 485.000)
Employer: MBI Development d.o.o. Sarajevo
Location / Address: Ilidža, Sarajevo
Period: July 2012 – September 2012