Construction works, mechanical and electrical installations, for the Utility for compressing a natural gas.
Compressed natural gas is stored at a high pressure, usually 200-250 bars. CNG demands very robust specially-designed cylindrical tanks, which use a lot of space and are heavy. In addition, gas compression requires expensive multi-stage high-pressure compression technology.
The station is built according to the regulations as well put into operation on scheduled time.
Basic information:
Contract value: 242.200 BAM (€ 123.835)
Investor: Energtek Herz d.o.o. Široki Brijeg
Location / Address: Sarajevo
Period: September 2012 – November 2012