Pump station Bivolak

Investor: UMNIK Kosovo
Start of construction: July 2002
Completion of construction: April 2003
Value of performed works 1,374,948.50 BAM (€703,000.00)

Work was carried out on the reconstruction of the pumping station with three pumps:

  • capacity Q=3×1600 kW,
  • engine power N=3×6.3 kV,
  • lifting height H= 90 m (NPSH=10 m)

Ongoing projects

PS Krivoglavci 1 i 2

Investor/Contractor: Municipality of Vogošća, KJKP “ViK” d.o.o. SarajevoEngineer: KS Construction InstituteProject value: 717,700.00 BAMPS Krivoglavci 1As part of the activities to solve the problem of