Skenderaj Kosovo water supply system

The aim of this project is to reduce the amount of leakage – losses on water network systems in cities Skenderaj, Glogovac and Obilic, and to improve water availability to consumers, both in quantity and quality.
Replacing the main water distribution lines, construction of new pipelines and reconstruction of house connections with the replacement of worn out fittings and valves.
In these cities was made the replacement of the main lines with a total length of 6,000 m Ductile pipes DN 100, 125, 150 and 200 and 1400 m HDPE pipes ɸ63 – 90, and conducted 1450 household connections.

Total Value: 714.980,00BAM (365.563,47€)
Investor: IC Consultant / ILF
period 2002-2003

Ongoing projects

Waste water treatment plant Prozor-Rama

Key project data: Identification number: 20060272-s040. Subject: Design and construction of wastewater treatment plant Prozor Rama (PE 3,000+3,000). Employer: Municipality of Prozor Rama, Bosnia and Herzegovina. Contract duration: 2 years. Signing of the contract, date: 16.07.2019. Contract Price: 3,547,725.99 KM (1,813,923.50 €)

More info »

Waste water treatment plant Bosanski Petrovac

Key project data: Identification number: 01/1-1-25-7482-UP-1/17
Subject: Design and construction of a wastewater treatment plant in Bosanski Petrovac (PE 5,000). Employer: Municipality of Bosanski Petrovac, Bosnia and Herzegovina. Contract duration: 2 years. Signing of the contract, date: 30.10.2018. Contract Price: 2,929,057.32 KM (1,497,603.23 €)

More info »

Villas SMUK Bjelašnica

Location: Trnovo municipality, Babin Dol, Olympic mountain Bjelašnica (300m from the ski lifts), Sarajevo, Federation of BiH, Bosnia and Herzegovina. Project description: The project includes 6 (six) villas with apartments, which together form one complex.

More info »
Shopping Basket