Construction of the main Plazulje-Potočari pipeline













At the beginning of March 2024 a contract was signed between the Brčko District Government and the Unioninvest company from Sarajevo on the construction of the main transport pipeline Plazulje-Potočari. This capital project will permanently solve the problem of water supply in Brčko and its surroundings.

Value: 14.015.645,34 € (27.412.219,63 BAM)

The construction project includes the following main groups of works:

Adaptation of the Plazulje pumping station;
Construction of the main transmission pipeline with a length of 14 km;
Construction of a semi-buried reservoir with a capacity of one thousand cubic meters in Potočari;
Construction of a water pipeline connecting the reservoir in Potočari with the existing water supply network;
Chlorination devices;
Supporting electrical equipment and systems (SCADA, etc.).

Place: District Brčko

Performance period 18 months

viber_image_2024-09-16_10-42-11-790

PS Krivoglavci 1 i 2

Investor/Contractor: Municipality of Vogošća, KJKP "ViK" d.o.o. Sarajevo

Engineer: KS Construction Institute

Project value: 717,700.00 BAM

PS Krivoglavci 1

As part of the activities to solve the problem of water supply in the settlements of Svrake and Krivoglavci I, the construction of the Krivoglavci I pumping station is planned. The pumping system consists of 3 pumping units, of which 2 are working and 1 is spare.

In the first phase, for the period until 2030, the inflow of water to PS is all day (24 h), in the amount of 9.45 l/s, and pumping towards the Krivoglavci 1 reservoir is 22 h per day, in the amount of 10.31 l/s, H= 69.27 mVS, 100%; 84%.

In the final phase (end of the planning period, 2050), the pumping system has the characteristics Q= 13.29 l/s, H= 71.71 mVS, 100%; 98%.

PS Krivoglavci 2

As part of the activities to solve the problem of water supply in the Krivoglavci II settlement, the construction of the Krivoglavci II pumping station is planned. The pumping system consists of 2 pumping aggregates, of which 1 is working and 1 is spare.

In the first phase, for the period until 2030, the inflow of water to PS is all day (24 h), in the amount of 4.11 l/s, and pumping towards the Krivoglavci 2 reservoir is 22 h per day, in the amount of 6.17 l/s, H= 70.61 mVS, 91%.

In the final phase (end of the planning period, 2050), the pumping system has characteristics Q= 7.38 l/s, H= 72.84 mVS, 99%.

viber_image_2024-04-12_21-47-35-883

Construction of the pumping station and reservoir in Poturovići

Project: Execution of works on water supply for the settlements of Poturovići and Ljubina in the municipality of Vogošća – Phase I (Construction of the pumping station and reservoir “Poturovići”).

Client: Municipality of Vogošća, KJKP “ViK” d.o.o., Sarajevo

Supervision: Sarajevo Canton Construction Institute

Contractor: Unioninvest d.d., Sarajevo

Designer: Institute for Water Management d.d., Sarajevo

Project Value: 919,177.01 BAM (468.500 €)

Project Description: As part of the activities to address the water supply issues in the settlements of Poturovići and Ljubina in the municipality of Vogošća, the construction of facilities – a pumping station, access road to the reservoir, and reservoir – is planned as the first phase. The purpose of the pumping station is to transport a water quantity of 1.62 l/s (from the water chamber V = 11.25 m3) via the designated pressure pipeline DN 50 mm, with a length of approximately 576.0 m to the Poturovići reservoir (Kdn/Kpr = 622.0/625.0 m.a.s.l.).