Reconstruction of the pumping station capacity 100/200 l / s for the basic boot with screw pumps, (8,640 m3 / d, 3 pcs)
Total Value: 578,617.00 BAM (€ 295,842.20)
Investor: Municipality of Vrsac
Period 2005


Investor: UMNIK Kosovo
Start of construction: July 2002
Completion of construction: April 2003
Value of performed works 1,374,948.50 BAM (€703,000.00)
Work was carried out on the reconstruction of the pumping station with three pumps:


The aim of this project is to reduce the amount of leakage – losses on water network systems in cities Skenderaj, Glogovac and Obilic, and to improve water availability to consumers, both in quantity and quality.
Replacing the main water distribution lines, construction of new pipelines and reconstruction of house connections with the replacement of worn out fittings and valves.
In these cities was made the replacement of the main lines with a total length of 6,000 m Ductile pipes DN 100, 125, 150 and 200 and 1400 m HDPE pipes ɸ63 – 90, and conducted 1450 household connections.
Total Value: 714.980,00BAM (365.563,47€)
Investor: IC Consultant / ILF
period 2002-2003
Key project data:
Identification number: VIK-02/2018
Subject: RECONSTRUCTION OF PUMPING STATIONS AND INSTALLATION OF MEASURING CONTROL EQUIPMENT – SARAJEVO
Employer: KJP VIK doo Sarajevo, BiH
Signing of the contract Date: 24.09.2019.
Contract Price: 12,586,903.03 KM (6,435,581.33 €)
The project was successfully completed.





Unioninvest d.d. as the main contractor, performed the contracted works promptly, professionally, with high quality and within the given deadlines.
Key project data:
Identification number: BA-EBRD-VisokoWSS-W-02/18
Subject: Construction of the Poriječani primary water supply network, reconstruction of the Pertac reservoir and the Vrutak spring
Employer: JKP Visoko d.o.o. Visoko, Bosnia and Herzegovina
Contract duration: 300 days
Signing of the contract, date: 15.02.2019.
Contract Price: 2,682,228.99 KM (1,371,401.90€)



Key project data:
Identification number: BA-EBRD-VisokoWSS-W-03/20
Subject: Construction of water supply subsystem “Moštre”
Employer: JKP Visoko d.o.o. Visoko, Bosnia and Herzegovina
Contract duration: 365 days
Signing of the contract, date: 19.08.2020.
Contract Price: 3,773,770.47 KM (1,929,498.20€)
The project was successfully completed.



Investor: Municipality Centar/KJKP “Vodovod i kanalizacija” d.o.o. Sarajevo
Engineer: KJKP “Vodovod i kanalizacija” d.o.o. Sarajevo
Contractor: Unioninvest d.d. Sarajevo
Project value: 246,347.87 KM including VAT
The project solution envisages that the water from the hydroflex “Slatinski put” is transported to the newly built collection basin of the hydroflex plant through the existing dactyl pipeline DN 100 mm, and then, using the hydroflex station, the water is pumped through pressure pipelines to consumers, who until now had no supply from the city’s water supply network . Above the collection basin, the construction of a brick building with a flat AB roof is planned, to accommodate the hydroflex plant with an expansion tank, as well as the necessary plumbing fixtures and fittings.
Operational readiness and safety of the system will be improved by abolishing the old local pumping station and building a new one with associated equipment.
The project was successfully completed. Management of the network, as well as the new PS, was taken over by KJKP ViK d.o.o. Sarajevo.




The purpose of the contract is to provide supervision services over the works on behalf of the contracting authority to be carried out in relation to construction of the prison facility to be built according to the European Prison Rules. The consultant is required to act as the ‘Engineer’ in FIDIC terms and to provide supervision services with full responsibility for the execution of all works compliant to contract conditions, as well as to ensure the provision of the services necessary during the defects notification period.
The construction of a State level maximum security prison in Bosnia and Herzegovina is a key part of improving the judiciary system. The State prison will be for adult males; untried prisoners remanded in custody or prisoners sentenced by the State Court.
The total capacity will be for 348 inmates. The State Prison is situated in East Ilidza Municipality, app. 11 km from Sarajevo. It is estimated that the State Prison facilities for primary prison activities will cover a floor area of approximately 23.000 m². Additionally 10.000 m² is foreseen as service areas for installation, emergency operation etc.
The establishment will be a low energy structure, having complex security systems.
The foreseen construction period will be app. 24 months and works will be implemented as per FIDIC MDB Harmonized Construction Contract General Conditions.
The total value of the contract: 1,129.813 BAM (577.664,10 €)
Investor: Project Implementation Unit on behalf Ministry of Justice Bosnia and Herzegovina
Total construction investment: 70,000.000 BAM (35,000.000 €)
Period: July 2014 – … (ongoing)

Opening and start up of new Surgery Ward with intensive care on the floors 06 and 07 of CMB, Clinical Center University of Sarajevo, is a great success for the entire BH healthcare.
With its technical resources and potential, the new surgical ward belongs in one of the most modern in the region and provides superior staff working conditions.
Unioninvest supervised the construction, civil and craft works and installation works for surgery ward with intensive care on floors 06 and 07 CMB’s Clinical Center University of Sarajevo
Construction works includes construction of ten modern surgery rooms, 19 intensive care beds and 19 recovery rooms.
The total value of the contract: 133.801 BAM (68.411 €)
Investor: Clinical Center of University of Sarajevo
Area: approx 5000 m2
Location / Address: KCUS, CMB Central Medical Block, Koševo, Sarajevo
Total construction investment: 9,317.000 BAM (4,763.706 €)
Period: April 2012 – March 2013


Supervision of the construction, civil and craft works, installation works and furnishing the interior reconstruction space on the ground floor “DIP” – extension of the Clinic for hemodialysis
The total value of the contract: 13.308 BAM (€ 6.805)
Investor: Clinical Center University of Sarajevo
Area: approx 500m2
Location / Address: KCUS, Kosevo, Sarajevo
Total construction investment: 607.480 BAM (€ 310.600)
Period: 6 months, February 2012 – July 2012